Problem Description

Currently it is impossible to change the order of System Fields in the View Issue Screen as well as remove them from the screen without hiding them in the system configuration.

The later is already being tracked on JRA-20138, so this is to have also the ability to change its order - that is, so that system fields also follow the order of fields specified in the Screen configuration.


More Details: https://jira.atlassian.com/browse/JRASERVER-37756

Solution:

  1. Install IssueLayout.
  2. Create a new Layout
  3. Add the issueLayout Details Panel
  4. Add the system fields to the view screen